齙 Active macro> LINK2.MAX TextPRO 5.20X macro to continue loading a long file after a LINKED LOAD in Bank 1. Uses Banks 1,2 & Main only.-Load first file segment into Bank 1.-Press START, type LINK2-Press START to load next segments into Bank 2 & Main (if necessary).-Bank status will be displayed with "Press any key" after the load.-Editor will return to Bank 1 and TEXTPRO.MAX will load after keypress.@Load file into Bank 1 - press ԛ#2}Y ,CBanks 1 & 2 only > Press any key1?M}Y ϛBanks 1,2 & Main > Press any key1?Banks >Linked Load >Press any key1??TEXTPRO.MAX